Gülser Eisenbahnbrücke v1.0
The Trier – Koblenz line crosses the Moselle on it. The Güls railway bridge was built almost simultaneously with the Horchheim railway bridge over the Rhine. Both bridges were used to connect the Moselle route to the so-called “Kanonenbahn” Berlin – Metz. Construction work on the bridge began in April 1877 and was completed in October 1878. Since it was missing in MSFS, I added it.
GPS Coordinates: 50.345 7.553
MSFS 2020 Scenery
22 Dec, 2020
MSFS 2020 Scenery
17 Mar, 2021
MSFS 2020 Scenery
11 Oct, 2020
GPS Coordinates: 50.345 7.553
MSFS 2020 Scenery
22 Dec, 2020
MSFS 2020 Scenery
17 Mar, 2021
MSFS 2020 Scenery
11 Oct, 2020
Download Links
Report a problem
Gülser Eisenbahnbrücke v1.0
Advertisement
Remove ads